floor paint factory

Home

floor paint factory

  • Complete guide to water-based epoxy art floor paint construction: a perfect guide from preparation to completion
    Complete guide to water-based epoxy art floor paint construction: a perfect guide from preparation to completion
    Jul 04, 2025
    If you want to create a stunning water-based epoxy art floor paint, professional and standardized construction is essential. Next, we will disassemble the entire process from preliminary preparation to final completion to help you achieve the ideal floor effect. 1. Careful preparation before construction  Floor base treatment  Make sure the floor is dry and flat, and thoroughly remove oil, dust, loose particles and other debris.  For old floors, use a grinder to polish, remove old coatings and floating slurry, so that the floor forms a uniform rough surface and enhances adhesion.  If there are cracks or depressions on the floor, repair it with epoxy mortar, and polish it again after drying.  Preparation of construction tools and materials  Prepare construction tools such as rollers, scrapers, spray guns, and mixers to ensure that the tools are clean and free of impurities.  Strictly follow the proportions in the product manual, mix the main agent and curing agent, add color paste to mix the color according to the requirements of the artistic effect, and the prepared paint must be used up within the specified time.​ 2. Orderly construction process​ Primer application​ Use a roller to evenly roll the prepared water-based epoxy primer on the treated floor to ensure uniform coating thickness without missing or dripping. ​ The drying time of the primer is usually 4-8 hours (depending on the ambient temperature and humidity). The next step can be carried out after drying. ​ Mid-coat application​ Mix the water-based epoxy mid-coat material with an appropriate amount of quartz sand and apply it with a scraper. ​ It can be applied multiple times according to the designed thickness. Each time, you need to wait for the previous layer to dry completely. After the mid-coat is completed, the floor will form a rough surface to prepare for the topcoat application. ​ Topcoat application​ If you want a pure color effect, directly use a roller to evenly roll the prepared topcoat. ​ If you need artistic texture, use tools such as spray guns and scrapers, such as spray guns to create a gradient effect, and scrapers to create irregular geometric textures. Pay attention to the speed and coating uniformity during construction to avoid color difference and unevenness.​ 3. Finishing touches of surface treatment and maintenance Surface treatment (glazing) After the topcoat is applied, roll or spray the water-based epoxy glazing paint evenly on the surface of the topcoat to form a transparent protective film. ​ After the glazing paint dries, it improves the wear resistance, stain resistance and glossiness of the floor, enhances the UV resistance and delays aging. ​ Maintenance The maintenance period is generally 7-10 days. During this period, avoid the floor from being hit by heavy objects or scratched by sharp objects. People and vehicles are prohibited from walking on uncured floors. ​ Keep the room well ventilated to ensure that the floor paint is fully cured to achieve optimal performance.
    Read More
  • Unlock a new realm of space aesthetics! A complete analysis of water-based epoxy art floor paint
    Unlock a new realm of space aesthetics! A complete analysis of water-based epoxy art floor paint
    Jul 04, 2025
    Among materials that are both beautiful and practical, water-based epoxy art floor paint has attracted much attention due to its unique advantages. The following is a detailed analysis of this material from multiple dimensions: 1. Excellent environmental performance, a healthy and safe choice Water-based epoxy art floor paint uses water as a diluent. Compared with traditional solvent-based floor paint, it greatly reduces volatile organic compound (VOC) emissions and effectively solves the problem of air pollution. The product is odorless and non-toxic, meets national environmental protection standards, and is suitable for places with high environmental protection requirements such as homes, schools, and hospitals to ensure the health and safety of personnel. 2. Strong artistic expression, creating a personalized space Through different construction processes and color matching, it can present the luxury of marble texture, the naturalness of wood grain, and modern visual effects such as abstract art and geometric patterns. According to different styles and needs of commercial spaces, office spaces, home environments, etc., exclusive floor decoration plans can be customized to enhance the style of the space.​ 3. Excellent physical properties, strong and durable​ It has high strength, high wear resistance and good impact resistance. It can withstand the pressure of pedestrians, furniture handling, vehicle driving, etc. It is not easy to scratch, wear and crack. ​ The surface is smooth and dense, with good stain resistance and corrosion resistance. It is difficult for water stains, oil stains and chemical reagents to penetrate. It is easy to clean and maintain, reducing the later cost. ​ 4. Convenient construction, efficient and worry-free​ The construction process is relatively simple, the construction period is short, and the floor laying and decoration can be completed in a short time. ​The requirements for ambient temperature and humidity are loose, and construction can be carried out in an environment of 5℃ - 35℃. The drying speed is fast and the project progress is shortened. ​ There is no large amount of dust and noise during the construction process, and the impact on the surrounding environment is small. It is suitable for places with dense personnel or high requirements for the construction environment. ​ 5. Wide range of application scenarios​ Commercial fields: such as shopping malls, supermarkets, specialty stores, etc., unique artistic design can attract customers and enhance the competitiveness of commercial space. ​ Office space: Create a fashionable and comfortable environment to stimulate employees' enthusiasm and creativity.​ Home decoration: suitable for living room, bedroom, kitchen, bathroom, etc., showing the owner's personality and taste. ​ Public space: in schools, hospitals, museums, exhibition halls and other places, its environmental protection performance and artistic beauty can be fully utilized.
    Read More
  • A complete analysis of the construction of water-based acrylic floor paint-a complete guide from preparation to maintenance
    A complete analysis of the construction of water-based acrylic floor paint-a complete guide from preparation to maintenance
    Apr 27, 2025
     water-based acrylic floor paint   1. Key preparations before construction Surface treatment: New concrete needs to be cured for more than 28 days, with a moisture content of ≤6%, and oil stains and floating slurry should be removed. The old floor needs to be polished to a solid base, and acid washing should be used to neutralize the alkalinity if necessary. Environmental requirements: Construction temperature ≥10℃, humidity 30%-70%, avoid rainy season or high temperature exposure to prevent bubbling or sagging of the paint film.   2. Standardized construction process Primer sealing: Roll on penetrating primer (such as epoxy sealing primer) to enhance adhesion and seal pores, with a dosage of about 6-8㎡/kg. Middle coating leveling: Mix quartz sand (80-100 mesh) and floor paint and scrape to increase thickness and compressive strength, with a dosage of 3-4㎡/kg. Top coating decoration: Roll or spray in two passes to ensure uniform color, each pass is about 25 microns thick, and the total dosage is 4-5㎡/kg. Surface protection (optional): Spray silicone acrylic topcoat to improve gloss and stain resistance.   3. Construction precautions Dilution ratio: Mix according to product instructions, excessive water addition may cause sagging or reduce performance. Interlayer drying: Each coat needs to be completely dry (usually 2-8 hours) to avoid the next process when it is not completely dry.   4. Maintenance and acceptance Maintenance period: Under 25℃ environment, it can be walked on for 48 hours and can be used normally after 7-10 days. Low temperature or high humidity requires extended maintenance time. Acceptance criteria: paint film has no hollows, uniform color, and meets water resistance test (no peeling after 72 hours of immersion) and hardness test standards.
    Read More

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
submit

home

products

WhatsApp

Contact Us

Need Help? Chat with us

Start a Conversation

Hi! Click one of our members below to chat on